The Estate Readiness Report 2026/27
A free 32-page planning guide for public sector leaders, with a 16-question self-assessment to show which gaps to close first.
:
Download the free report
32 pages · Free
Public sector estates are being asked to carry more traffic, more devices and more accountability than ever – often on infrastructure specified for a different decade. Four of the findings that drive the report.
Sources listed in full in the report.
£10.14m
The estimated cost of the 2020 ransomware attack on Redcar and Cleveland Borough Council. 135,000 residents lost access to online services for weeks.
Cyber incidents arrive under pressure, at speed and without the room to control costs or operational impact.
Find out where your estate is exposedThe Estate Readiness Gap Model
A shared language for triaging investment, a defensible basis for budget conversations and a structured way to sequence work through to 2030. Each gap can be scored – and each one feeds the next if it’s left open.
Bandwidth, resilience and quality of service versus what services, staff and users actually need right now.
Where the estate is well connected and where it isn’t – Wi-Fi dead zones, rural sites, 5G gaps and credible altnet options.
Actual performance, security posture and usage versus what leadership can see in real time. If you can’t see it, you can’t manage it.
Controls, monitoring and response versus CAF v4.0, GovAssure, DfE standards and the threats your estate faces today.
Today’s capacity envelope versus what it takes to absorb the AI, cloud, IoT and service-redesign roadmap you’ve already committed to.
The report shows how to score each gap, and which to close first.
Download the free report
The report walks through what infrastructure gaps look like on the ground, sector by sector.
When the network drops, the lesson stops. When safeguarding systems drop, something more serious starts.
If something breaks across 40 sites on 40 contracts, recovery is only as fast as the weakest link.
In housing, a connectivity problem soon becomes a missed repair or a repeat visit.
“Infrastructure risk never shows up as ‘infrastructure’ on a line anywhere. It’s overtime, a delayed project, an unplanned spend somewhere else entirely. Once an organisation starts looking for it that way, it starts appearing in places you weren’t expecting.”
“You rarely get one big outage that gives the game away. It’s more a sense that you’ve stopped planning ahead and started just keeping the lights on.”
A planning tool, not a product pitch.
32 pages of public sector analysis and fully referenced data, with examples from schools, councils and housing – written to help your leadership team agree where the estate stands and what to fix first.
The Estate Readiness Gap Model, explained
A 16-question self-assessment for your leadership team
Three commercial approaches to doing more with less
Your report is opening now. We’ve also emailed you a copy, so it’s there for your next leadership meeting.
Didn’t open? Use the link below.
Open the report (PDF)